United States Costs

Index Verified Last verified 2026-10-26
Quick answer

US cost pages carry the state fee rules and the published city tables. California is live, with the permit-fee library covering every other state as schedules are verified.

California is the worked example. The state exempts units under 500 sq ft from school developer fees as of January 1, 2026 (SB 543), caps impact fees in statute, and its cities publish permit tables: San Diego by flat table, San Jose on a dedicated ADU schedule, Los Angeles by project valuation. The state page tabulates those rows with sources, and the permit-fee library carries the four-line method so other cities load as their schedules are verified.

The timeline page covers the other half of the money question: the statutory clocks that decide how long your money is committed before work starts. In California a complete application gets a 15-business-day completeness check and a 60-day approve-or-deny decision.

State Cost page Status
California ADU cost California Verified · 2026-09-21
All states How long it takes to build an ADU: approval and build clocks Verified · 2026-09-24
Other states City fee tables load via the permit fees page as verified Rolling

FAQ

California has a full state cost table today. The permit-fee library is the vehicle for other states: its four-line method (plan check, permit and inspection, impact and development fees, school or utility charges) applies anywhere a city publishes a schedule, and state pages load as those schedules are verified.

In California, units under 500 sq ft are exempt from school developer fees as of January 1, 2026 under SB 543, which moves a real line of the budget for small ADUs. The California page keeps the cap, the exemption and their sources on one row.

Corrections

Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.