SB 9 California 2026: Lot Splits, ADU Sales, New Rules

Law tracker Quarterly tracker · as of Oct 2026 Verified Last verified 2026-10-22
Quick answer

SB 9 California still works the way it did when it took effect in 2022: a two-unit project on one lot, or a split into two buildable parcels. The recent bills sit around it: AB 1033 opened a condo-style sale path for ADUs, SB 450 added 60-day deemed approval, AB 462 sped up coastal permits, and SB 543 and AB 1154 took effect on January 1, 2026. On September 29, 2026 the Governor signed AB 956 (up to two detached ADUs ministerially; HOA covenants restricting ADUs void) and SB 1117 (impact fees on the first two ADUs charged only on the area above 750 square feet), both effective January 1, 2027. AB 2601, signed September 30, 2026, completes the set: two-unit applications and urban lot splits become eligible for concurrent processing, permits can be conditioned on a recorded parcel map, and that map may include a condominium plan: also effective January 1, 2027.

SB 9 California remains in force in 2026, and it still opens two paths on a single-family lot: a two-unit project under Government Code §65852.21, or an urban lot split under §66411.7 that turns one parcel into two buildable ones. Both sections stand in the code today. What moved is the ground around them: SB 450 added 60-day deadlines with deemed approval to both paths, AB 1033 opened a condo-style sale route for ADUs, and AB 462 put coastal ADU permits on the same 60-day clock. On January 1, 2026, SB 543 and AB 1154 changed ADU fees and JADU occupancy rules, and on September 29 and 30, 2026 the Governor signed AB 956, SB 1117 and AB 2601, which take effect on January 1, 2027. Each change is logged below with its date and a link to the official text.

SB 9 California: Two Paths on One Lot

The two-unit path lets a homeowner place up to two residential units on a single-family zoned lot in an urbanized area or urban cluster, approved ministerially without discretionary review or a hearing. The lot split path divides the parcel into two new parcels of roughly equal area, one of them at least 40 percent of the original lot, each at least 1,200 square feet. Each resulting parcel can hold two units, which is how a single lot ends up supporting four homes. The first path suits a homeowner who wants a second dwelling without touching the property map; the second suits those carving out a buildable parcel for relatives or for sale.

Rule Two-unit project (§65852.21) Urban lot split (§66411.7)
What it creates Up to 2 units on the existing lot 2 new parcels, up to 2 units each
Approval Ministerial, no hearing Ministerial parcel map, no hearing
Deadline 60 days, then deemed approved 60 days, then deemed approved
Minimum parcel size Not applicable 1,200 sq ft per new parcel
Parking Max 1 space per unit, waived near transit or car-share Same
Rentals Terms longer than 30 days Terms longer than 30 days

Both paths share the same guardrails. They apply in single-family zones inside urbanized areas or urban clusters. A project cannot demolish or alter rent-restricted housing, rent-controlled housing, or housing occupied by a tenant in the last three years, and a parcel whose owner withdrew rentals under the Ellis Act in the prior 15 years does not qualify. Historic resources are excluded. Standards must be objective, side and rear setbacks cap at four feet, parking caps at one space per unit, and denial is possible only for a specific, adverse impact on public health and safety.

A few quieter rules round out the picture. No setback applies to structures rebuilt in the same location and dimensions as what stands today. A lot split cannot be loaded with rights-of-way dedications or offsite improvements, and a city that wants parcels smaller than 1,200 square feet may set its own lower minimum by ordinance. On the wastewater side, a project tied to an onsite sewage system needs a percolation test taken within the last five years, or a recertification within ten.

The owner-occupancy affidavit on SB 9 California lot splits

Lot split applicants sign an affidavit to occupy one of the units as their principal residence for at least three years. Community land trusts and qualified nonprofit corporations are excepted, and local agencies cannot add other owner-occupancy conditions on top (§66411.7). That runs in the opposite direction from ADU law: since January 1, 2024, AB 976 has barred owner-occupancy requirements for ADUs statewide, a rule we detail in our California state profile.

Backyard ADU California - a compact second unit beside a single-family home

What Changed After 2021: SB 450, AB 1061 and SB 1426

Three bills have touched the SB 9 California sections since enactment, and none took anything away.

Year Bill Change to SB 9
2024 SB 450 (Ch. 286, approved Sep 19, 2024, effective Jan 1, 2025) Added the 60-day deadline with deemed approval and written defect lists to both paths; removed the 25 percent exterior wall demolition cap; narrowed denial grounds to public health and safety
2025 AB 1061 (Ch. 505, approved Oct 10, 2025, effective Jan 1, 2026) Narrowed the historic-resource exclusions on both paths: parcels are excluded only where a contributing structure within a State Inventory historic district, a city or county designated historic property or district, or an individually listed historical resource is involved. No longer any parcel within a designated district or landmark site
2026 SB 1426 (Ch. 56, urgency, effective Jun 30, 2026) Housekeeping only: reorganized sections and refreshed cross-references as part of an annual-report cleanup; no substantive change

The SB 450 changes are the ones that matter in practice. An agency that misses the 60-day deadline approves the project by inaction, and a denial must arrive with a list of defects the applicant can fix. For applicants, that turned SB 9 from a right on paper into a deadline the planning counter has to meet. AB 1061 worked on the guardrails instead: it rewrote the historic-resource exclusions so more parcels qualify. The protected category is now a contributing structure or an individually listed resource, not every parcel inside a designated district. SB 1426 reads, in the code credits, like a change to SB 9; it is in fact an annual-report omnibus that reorganized the language without touching the substance. We log it here so the credit line does not get mistaken for a policy shift.

AB 1033: Selling an ADU as a Condominium

AB 1033 (2023) answered a question the ADU wave created: can the small home be sold instead of rented? The answer is yes, but only as a condominium, and only where the city or county adopts an ordinance allowing it. The statute says agencies may adopt such an ordinance, so the path is optional for cities: whether it exists at your address is a local question. The provision now sits at §66342, carried into the ADU chapter by the 2024 recodification. Its conditions are concrete:

  • a condominium created under the Davis-Stirling Common Interest Development Act
  • conformance with the applicable objective requirements of the Subdivision Map Act and local subdivision ordinances
  • an inspection the ADU passes before the condo plan is recorded, shown by a certificate of occupancy or a housing quality standards report from a HUD-certified inspector
  • written consent from every lienholder on the property, recorded with the plan
  • consumer notice explaining that lenders may require payoff or refinancing
  • notice to the water, sewer, gas and electricity providers
  • written approval from the association in an existing planned development

SB 9 California and AB 1033 solve different problems. A lot split creates separate fee-simple parcels; the condominium route divides ownership inside one parcel. Lender consent is a common obstacle in condo conversions, which is why the statute makes the notice to applicants mandatory.

What AB 462 Changed in October 2025

ADU exterior California - expandable container unit with a modern facade

AB 462 went into force the day Governor Newsom signed it, October 10, 2025, as an urgency statute (Chapter 491). It amends two sections of ADU law rather than the SB 9 California sections, and both changes read as procedure rather than permission. Like SB 450 before it, the bill states that its subject is a matter of statewide concern, which carries the rules to charter cities as well.

Coastal development permits on a 60-day clock

Under 66329, a local agency must approve or deny a coastal development permit for an ADU within 60 days of a complete application, is no longer required to hold a public hearing for it, and its decision cannot be appealed. Where no certified local coastal program exists, the Coastal Commission takes the application under the same 60-day clock, and there a missed deadline carries a real consequence: the application is deemed approved, unless it was filed together with a new primary dwelling, in which case the Commission may wait for that decision.

Certificates of occupancy in declared disaster counties

Under 66328, a county covered by a gubernatorial emergency proclamation made on or after February 1, 2025 must issue a certificate of occupancy for a detached ADU even though the primary dwelling has none, where the primary was substantially damaged or destroyed by the event named in the proclamation. The exception does not cover ADUs attached to the primary dwelling.

Effective January 1, 2026: SB 543 and AB 1154

Two changes landed at the start of 2026. SB 543 renumbered the ADU fee rules from former §66324 to §66311.5 and added a school fee exemption: an ADU or JADU under 500 square feet of interior livable space is deemed not to increase the assessable space for school developer fees. The two fee boundaries differ, impact fees stop at 750 square feet or less while school fees stop under 500, and both are set out in our California cost page. AB 1154 narrowed JADU owner-occupancy at the same time: an owner-occupancy condition can now apply only where the JADU shares sanitation facilities with the primary home (§66333).

Signed September 2026: AB 956 and SB 1117

Governor Newsom signed both bills on September 29, 2026, one day before the constitutional signing deadline: AB 956 as Chapter 791 and SB 1117 as Chapter 809, Statutes of 2026. Neither carries an urgency clause, so both take effect January 1, 2027.

AB 956 (Quirk-Silva) makes two changes. On the HOA side, it amends Civil Code §714.3 and §4751 so that a covenant restricting ADUs is void not only on lots zoned exclusively for single-family use, but on any lot zoned to allow single-family residential use, while keeping the reasonable-restrictions exception for rules that neither unreasonably raise costs nor effectively prohibit construction. On the permitting side, it amends Gov. Code §66323 to raise the number of detached, new-construction ADUs a local agency must approve ministerially on a lot with a proposed or existing single-family dwelling from one to two, with side and rear setbacks of up to four feet; agencies can still cap the floor area at 800 square feet and apply the height limits referenced in §66321(b)(4), and need not approve a junior ADU on a lot where two detached ADUs have been built.

SB 1117 amends the same fee section SB 543 renumbered. Under §66311.5, impact fees for the first two ADUs on a lot must now be charged proportionately (and only on the area in excess of 750 square feet of interior livable space) for units above that threshold. Units of 750 square feet or less stay fee-free, and the definition still excludes utility connection fees and capacity charges.

Signed September 30, 2026: AB 2601

One day after the AB 956/SB 1117 signings, and on the constitutional signing deadline, Governor Newsom added AB 2601 (Chapter 955, Statutes of 2026, by Alex Lee). It connects the two SB 9 California paths rather than widening either. From January 1, 2027, an application for a proposed development of no more than two residential units in a single-family zone is eligible for concurrent processing with an application for the urban lot split parcel map; a local agency may condition building permits, grading permits or certificates of occupancy for the development on the applicant first obtaining approval and recording that parcel map; and the parcel map may include a condominium plan where the subdivider proposes one. In practice, a homeowner can run the two-unit project and the split at the same time instead of sequencing them. The bill carries no urgency clause, so it takes effect January 1, 2027.

What This Tracker Watches Next

This tracker updates on a quarterly cycle. The October 1, 2026 review confirmed the signing of AB 956 and SB 1117, logged above with their January 1, 2027 effective dates. The October 22 interim review added AB 2601 and closed three watch items with official records: the Coastal Commission's July 2026 guidance and a Los Angeles City planning directive (November 2025) now run the AB 462 coastal 60-day clock as published procedure, with Santa Cruz County conforming its ordinance; Berkeley's Ordinance No. 7,999-N.S. (adopted on second reading February 10, 2026) and Sebastopol's Ordinance No. 1162 (adopted January 20, 2026) join San Diego County as confirmed AB 1033 adoptions, alongside San José, whose ordinance dates to June 2024; and Los Angeles County's wildfire-recovery pages let households occupy a standalone ADU while the primary home is rebuilt: the mechanism §66328 provides, though the county pages describe it without citing the section. The next review falls on January 1, 2027, the day AB 956, SB 1117 and AB 2601 take effect; the watch list then turns to how cities implement the two-detached-ADU rule, the fee-above-750 formula, and the concurrent-processing pairing, and to any new bill that touches the SB 9 California framework. Each entry lands with a date and a source, and the corrections block below is open year-round.

FAQ

Yes. Both SB 9 sections remain in the Government Code: §65852.21 for two-unit projects and §66411.7 for urban lot splits. SB 450 (effective January 1, 2025) added 60-day deemed approval, and SB 1426 (June 30, 2026) made conforming cleanup amendments. Neither repealed the underlying rights.

An urban lot split creates two new parcels of roughly equal area, and each parcel can hold up to two units. The applicant must sign an affidavit to occupy one of the units as a principal residence for at least three years, and community land trusts and qualified nonprofit corporations are excepted (Gov. Code §66411.7). Whether and when a new parcel can be sold is a subdivision and title question; confirm with your city and a real estate attorney.

Only where the local agency has adopted an AB 1033 ordinance. The current statute (Gov. Code §66342) requires a condominium created under the Davis-Stirling Act, conformance with Subdivision Map Act requirements, an inspection passed by the ADU, written consent from every lienholder, notice to utility providers, and association approval in planned developments.

AB 462, an urgency bill signed October 10, 2025, requires local agencies to approve or deny ADU coastal development permits within 60 days of a complete application, no longer requires public hearings for those permits, and makes the decisions non-appealable (Gov. Code §66329). Where no certified local coastal program exists, the Coastal Commission applies the same 60-day clock with deemed approval if it misses the deadline, except for applications filed together with a new primary dwelling. The bill also lets a detached ADU in a declared disaster county get a certificate of occupancy before the primary dwelling, where the primary was substantially damaged or destroyed (§66328).

SB 543 exempted ADUs and JADUs under 500 square feet of interior livable space from school developer fees and renumbered the fee rules from former §66324 to §66311.5. AB 1154 narrowed JADU owner-occupancy conditions to units that share sanitation facilities with the primary home (§66333). Building permit and plan-check fees are unchanged and still vary by city.

Governor Newsom signed AB 956 and SB 1117 on September 29, 2026 (Chapters 791 and 809, Statutes of 2026). AB 956 requires ministerial approval of up to two detached, new-construction ADUs on a lot with a proposed or existing single-family home. Local agencies can still cap floor area at 800 square feet and apply the height limits referenced in §66321(b)(4), and voids HOA covenants that effectively prohibit or unreasonably restrict ADUs on any lot zoned to allow single-family residential use (Civ. Code §714.3 and §4751). SB 1117 charges impact fees on the first two ADUs of a lot only on the floor area above 750 square feet of interior livable space (§66311.5). Both take effect January 1, 2027.

AB 2601 (Chapter 955, signed September 30, 2026) wires the two SB 9 paths together from January 1, 2027: an application for a proposed development of no more than two units in a single-family zone becomes eligible for concurrent processing with an application for the urban lot split parcel map; local agencies may condition building permits, grading permits or certificates of occupancy on the parcel map being approved and recorded first; and the parcel map may include a condominium plan if the subdivider proposes one (Gov. Code §65852.21 and §66411.7).

Factory direct

Building an ADU in California?

SunModu exports expandable container ADUs from its own Hebei factory, flat-packed for site assembly, 15-20 day standard lead time on standard models, priced confirmed per order.

Get a factory quote
Sources & verification
  • Gov. Code §65852.21 and §66411.7 (SB 9, 2021, Ch. 162; amended by SB 450, Ch. 286 of 2024, and SB 1426, Ch. 56 of 2026); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • AB 462 (2025, Ch. 491, urgency, approved October 10, 2025), amending Gov. Code §66328 and §66329; leginfo.legislature.ca.gov (accessed 2026-09-21)
  • Gov. Code §66342 (ADU condominium conveyance; chapter added by SB 477, Ch. 7 of 2024); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • SB 450 (2024, Ch. 286, approved September 19, 2024, effective January 1, 2025); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • SB 1426 (2026, Ch. 56, urgency, approved June 30, 2026); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • Gov. Code §66311.5 (fee rules renumbered from §66324 by SB 543, effective January 1, 2026) and §66333 (JADU owner-occupancy, AB 1154); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • AB 956 (2025-26 session, approved by the Governor September 29, 2026, Chapter 791, Statutes of 2026; amends Civ. Code §714.3 and §4751 and Gov. Code §66323); leginfo.legislature.ca.gov (accessed 2026-10-01)
  • SB 1117 (2025-26 session, approved by the Governor September 29, 2026, Chapter 809, Statutes of 2026; amends Gov. Code §66311.5); leginfo.legislature.ca.gov (accessed 2026-10-01)
  • Governor Newsom signs housing legislation, September 29, 2026; gov.ca.gov press release (accessed 2026-10-01)
  • County of San Diego; ADU Zoning Ordinance Amendment (AB 1033 separate-sale program adopted March 4, 2026, in effect April 4, 2026); sandiegocounty.gov (accessed 2026-10-01)
  • AB 2601 (2025-26 session, Chapter 955, Statutes of 2026; approved by the Governor September 30, 2026; amends Gov. Code §65852.21 and §66411.7; concurrent processing of two-unit applications with urban lot split parcel maps, parcel-map permit conditions, condominium plans); leginfo.legislature.ca.gov; signing per gov.ca.gov legislative update of September 30, 2026 (accessed 2026-10-22)
  • AB 1061 (2025, Chapter 505, approved by the Governor October 10, 2025; amended the Gov. Code §65852.21 and §66411.7 historic-resource exclusions); leginfo.legislature.ca.gov (accessed 2026-10-22)
  • City of Berkeley; Ordinance No. 7,999-N.S. (adds BMC Chapter 21.29, ADU condominium subdivision implementing Gov. Code §66342; adopted on second reading February 10, 2026); berkeleyca.gov ordinance PDF and annotated agendas (accessed 2026-10-22)
  • City of Sebastopol; Ordinance No. 1162 (adds Sebastopol Municipal Code 17.220.025 implementing Gov. Code §66342 / AB 1033; adopted January 20, 2026, Minute Order 2026-021); cityofsebastopol.gov agenda packet and minutes (accessed 2026-10-22)
  • City of San José; ADU condominium conversions (Ordinance No. 31095, approved June 2024); sanjoseca.gov (accessed 2026-10-22)
  • California Coastal Commission; Guidance on processing local coastal program amendments for accessory dwelling units in the coastal zone, July 1, 2026 (AB 462: coastal CDP clock shortened to 60 days; ADU-only permits no longer appealable); documents.coastal.ca.gov (accessed 2026-10-22)
  • City of Los Angeles, Planning; CP-3643 AB 462 coastal development permit instructions, November 14, 2025 (60-day clock; deemed approval; applications filed with the Coastal Commission where no certified LCP exists); planning.lacity.gov (accessed 2026-10-22)
  • County of Los Angeles; wildfire recovery FAQ (standalone ADU may be occupied while the primary dwelling is rebuilt, through January 7, 2030) and New Laws page (AB 462: ADU occupancy certificates before the primary home is rebuilt in disaster areas); recovery.lacounty.gov (accessed 2026-10-22)
Verified 2026-10-22 by SunModu Atlas
Corrections

Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.