ADU Cost California: The Line-Item Table

State cost table Costs as of Sep 2026 Verified Last verified 2026-09-21
Quick answer

The ADU cost California sets in writing comes in two kinds. Government lines (permits, school fees, impact fees) are pinned to the dollar in published schedules, tabulated below with sources. Construction lines (delivery, foundation, the unit) are quote-specific, so they get drivers, not made-up averages.

Cost pages love one bracket: "$150K to $300K, depends." That bracket hides the only lines a homeowner can actually check before spending a dollar. So this table splits an ADU cost California budget the way the paperwork does: fee lines the government publishes, which you can verify to the cent, and construction lines that only become real in a quote. Every dollar figure below carries its source and date.

What state law sets for every ADU

Three fee rules follow the ADU wherever it is in California, because the state writes them into Government Code rather than leaving them to cities.

Fee line What the state sets Cite
Impact fees $0 for an ADU with 750 sq ft or less of livable space. Above 750 sq ft, fees are charged proportionately to the unit's burden. GOV §66311.5(c)
School developer fee Districts may levy up to $5.38 per sq ft of new residential assessable space ($0.87 commercial), the State Allocation Board maximum adopted January 28, 2026. Exempt entirely for an ADU or JADU under 500 sq ft since January 1, 2026 (SB 543). ED §17620; GC §65995(b)(3); GOV §66311.5(c)(3)
Utility connection ADUs created within existing space cannot be required to add a new or separate connection, and no connection fee or capacity charge applies to them. A new detached ADU can be required to connect, with any charge proportionate to its burden and capped at the reasonable cost of service. GOV §66311.5(b),(d),(e)

Two boundaries trip people up, so they are worth restating: impact fees stop at 750 sq ft, school fees stop at 500 sq ft. And the school fee ceiling is a ceiling, not a rate card. Districts levy their own amount up to that maximum, which is why the LAUSD program office rather than the state publishes what Los Angeles properties actually pay.

Permit fees by city

San Diego

San Diego's Development Services publishes its full plan check and inspection table in Information Bulletin 501. A detached ADU over 500 sq ft is rated as a new single dwelling unit; a detached ADU up to 500 sq ft, or an attached ADU up to 1,100 sq ft, is rated on the addition/remodel table.

Line Published amount Note As of
Plan check, detached ADU over 500 sq ft $8,085.26 Covers up to 3,000 sq ft; +$4.10 per sq ft beyond August 2026
Building inspection, detached ADU over 500 sq ft $8,401.90 +$4.21 per sq ft beyond 3,000 sq ft August 2026
Plan check, detached ≤500 sq ft or attached ≤1,100 sq ft $3,512.92 +$6.98 per sq ft above 500 sq ft August 2026
Building inspection, same projects $2,228.29 +$4.46 per sq ft above 500 sq ft August 2026
General Plan Maintenance fee $737.00 Once per project at application August 2026
Mapping fee $12.16 At plan submittal August 2026
Lead hazard prevention fee $58.00 Structures built before 1978 August 2026
Strong-motion instrumentation $0.13 per $1,000 valuation Residential, 2 stories or fewer; $0.28 for 3+ stories August 2026
Building standards fee $4.00 per $100,000 valuation Minimum $1.00 August 2026
Collection fee $17.11 Once per project at issuance August 2026
Water/sewer plan check $353.13 per EDU New meter or upgrade; $176.57 where the meter is unchanged August 2026

Source: City of San Diego IB 501, downloaded from sandiego.gov on 2026-09-21.

Los Angeles

Los Angeles computes building fees from the project's declared valuation under the LADBS fee ordinance, so the plan check and permit lines move with what the drawings specify rather than with a flat table. The department publishes an official Plan Check Fee Estimate System for pre-submittal estimates, and its own disclaimer applies: results are estimates based on the current fee ordinance and final fees are set when the application is submitted.

The published line every Los Angeles ADU does carry is the school developer fee. LAUSD levies it at the State Allocation Board rate, $5.38 per sq ft of new assessable space effective August 11, 2026, collected within the city by LAUSD and LADBS under their collection contract.

San Jose

San Jose prices ADUs on a dedicated flat schedule inside its Building Division Fee Schedule, which makes its bill the easiest to read of the three cities:

Line ADU up to 750 sq ft ADU 751 to 1,200 sq ft As of
Permit issuance $454 $681 FY 2025-26 schedule
Plan review $1,137 $1,950 FY 2025-26 schedule
Inspection $1,732 $2,520 FY 2025-26 schedule
City total $3,323 $5,151 FY 2025-26 schedule

Two notes from the same sources. Factory-built units get a discount: the schedule cuts plan review by 10 percent for modular homes. And the city's ADU FAQ states that school and parkland impact fees do not apply to ADUs under 750 sq ft. One caveat passed on as published: the city's fee pages currently display more than one effective date for the schedule, so the rows above follow the FY 2025-26 schedule marked effective August 11, 2025.

A worked San Diego example

Fee schedules reward patience, so here is the arithmetic for a detached 750 sq ft ADU in San Diego, assuming a $150,000 project valuation, no existing structure changes and no new water meter:

Line Amount
Plan check (new SDU table) $8,085.26
Building inspection $8,401.90
General Plan Maintenance $737.00
Mapping $12.16
Strong-motion ($0.13 × 150) $19.50
Building standards ($4 × 1.5) $6.00
Collection fee $17.11
City subtotal $17,278.93

The lines that sit outside that subtotal: the school district's developer fee, up to 750 × $5.38 = $4,035 at the state ceiling but set by the district; water and sewer capacity charges, which a new detached ADU can be required to pay where it connects, proportionate to its burden (§66311.5(e)); impact fees, which are $0 at 750 sq ft; and a $353.13 water/sewer plan check if the project adds a meter.

The lines only a quote can price

Four budget lines sit outside every fee schedule, and every fake national average smooths over exactly these.

Delivery and setting. Distance from the factory, whether the site receives the module by crane or sets it on grade with a reach stacker, and crew days on site move this line more than any published rate can. A flat-packed expandable unit ships differently from a volumetric one, and the port leg alone varies by carrier season.

Foundation. A slab on flat, open ground and a pier system on a slope are different projects with different engineering. Soil reports and frost or seismic requirements decide the scope before any pricing starts.

Utility tie-ins. Trenching distance to sewer, water and power, plus whether the panel has capacity or needs an upgrade, swing the electrical and plumbing scope. On the fee side, conversion-type ADUs are barred from connection charges under §66311.5(b),(d), while a new detached unit connects under §66311.5(e) with proportionate charges; the physical work is quoted either way.

The unit itself. Finish level, layout and export-grade specification set the factory price, which is why it is confirmed per order rather than published as a bracket. Bring a layout and a destination and the quote prices these four lines together instead of guessing them apart.

FAQ

Split it into two piles. The fee lines California sets in writing are tabulated on this page from official schedules: a 750 sq ft detached ADU in San Diego, for example, carries $17,278.93 in published city plan check, permit and administrative fees before the school district's charge. Construction lines such as delivery, foundation and the unit itself are quote-specific, so this page lists their swing factors instead of averaging them.

No. Under Gov. Code §66311.5(c)(1), an ADU with 750 sq ft or less of livable space pays no impact fee at all. Above 750 sq ft, impact fees apply in proportion to the ADU's burden. Note the school fee boundary is different: units under 500 sq ft are exempt from school developer fees as of January 1, 2026 (SB 543).

School districts levy developer fees under Education Code §17620 up to the State Allocation Board maximum, currently $5.38 per sq ft of new residential space ($0.87 commercial), adopted January 28, 2026 and in effect at LAUSD from August 11, 2026. A district can levy less. An ADU or JADU under 500 sq ft is exempt from January 1, 2026 onward.

No honest ranking exists, because cities compute fees differently: San Diego publishes flat plan check and inspection tables, Los Angeles computes from project valuation, and San Jose reads from its Building Fee Schedule. This page quotes each city's own published numbers instead of forcing a false comparison.

Factory direct

Ex-works pricing, confirmed per order

Layout, quantity and destination port in. Factory price and logistics plan out within one business day.

Get a factory quote
Sources & verification
  • Gov. Code §66311.5 (impact, connection and school fee rules); leginfo.legislature.ca.gov (accessed 2026-09-21)
  • California DGS, Office of Public School Construction: Annual Adjustment to SFP Grants and Developer Fee History ($5.38 residential, adopted 1/28/2026); dgs.ca.gov (accessed 2026-09-21)
  • City of San Diego Information Bulletin 501, Fee Schedule for Construction Permits, Structures (current revision, August 2026); sandiego.gov (accessed 2026-09-21)
  • City of San Diego Development Impact Fee Schedule, FY 2027; sandiego.gov/sites/default/files/feeschedule.pdf (accessed 2026-09-21)
  • LAUSD Impact Fee Program Office and Impact Fee Rates Change notice ($5.38 residential effective 8/11/2026); impactfee.lausd.org (accessed 2026-09-21)
  • City of San Jose, FY 2025-26 Building Division Fee Schedule (effective 8/11/2025) and ADU FAQs; sanjoseca.gov (accessed 2026-09-21)
  • LADBS Plan Check Fee Estimate System; 08web15.lacity.org/fee_est_dir (accessed 2026-09-21)
Verified 2026-09-21 by SunModu Atlas
Corrections

Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.