Cost pages publish the numbers other guides skip: per-city permit fees, freight rates, crane days, foundation and utility connection costs. Each line with its source and as-of date.
Most cost guides give you a bracket ($80K–$200K) and move on. This section does the opposite: one line item at a time, from public fee schedules and published rates, each with its source. Where a number is genuinely project-specific, the page says so instead of guessing.
How to read these pages: every line item names its source and its as-of date, and the source is a published document: a city fee schedule, a carrier rate sheet or a government cost index. Where a city prices by flat table (San Diego), by a dedicated ADU schedule (San Jose) or by project valuation (Los Angeles), the page says which. Where nothing is published, the row says so instead of inventing a number.
Two examples of the grain this buys: a detached 750 sq ft ADU in San Diego carries $17,278.93 in published city plan check, permit and administrative fees before the school district's charge, and ocean freight is priced per container position against published ocean indices, which is why the container pages keep freight as a dated line rather than a fixed price.
What you will not find here is a build quote. Quotes come from contractors and, for container models, from the factory confirmed per order. What this section gives you is the skeleton of the bill, so a quote can be checked line by line.
| Section | What it covers | Status |
|---|---|---|
| Line items | Permit fees, delivery, foundation, utilities: the cost library | Verified · 2026-09-23 |
| Permit fees | The four lines in every permit bill, with published city tables | Verified · 2026-09-21 |
| Garage conversion | The conversion bill: legal lines, real costs, insurance | Verified · 2026-09-22 |
| California cost table | State exemptions, school fee, and city tables for San Diego, Los Angeles and San Jose | Verified · 2026-09-21 |
| Container ADU cost | The model table crossed with the five bill lines | Verified · 2026-09-22 |
| Container vs traditional | The two bills side by side, with published studies | Verified · 2026-09-22 |
| Australia prices | Granny flat prices national view | Verified · 2026-09-22 |
| New South Wales | Granny flat cost NSW | Verified · 2026-09-22 |
| Build time | How long to build a granny flat | Verified · 2026-09-22 |
FAQ
Because no two cities compute the bill the same way. A permit bill splits into four lines (plan check, permit and inspection, impact and development fees, school or utility charges), and cities publish them by flat table, project valuation or per-square-foot schedule. The pages publish those rows with their sources instead of averaging them into a bracket.
From published documents: city fee schedules for the permit lines, carrier rates per container position for freight, and the factory price confirmed per order for the unit itself. Each line on the model pages carries its source and access date.
Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.