Five cost lines decide an ADU budget besides the unit itself: permits, delivery and setting, crane, foundation, and utility connections. This library keeps each line separate, because they are priced by different parties on different rulebooks. Published numbers get tables with sources; quote-specific lines get their drivers, not made-up averages.
Most cost guides open with a bracket, say "it depends", and close. This library does the opposite: it treats an ADU budget as separate line items with separate payers, publishes the numbers that governments actually print, and marks the lines that only a quote can price. Every table here carries its source and its as-of date.
What the library covers
| Line item | Status | Where the numbers live |
|---|---|---|
| Permit fees | Published rows loading | ADU permit cost, with the full San Diego table on the California cost table |
| Garage conversion | Legal lines verified; costs sourced | ADU garage conversion cost |
| Electrical and utility connections | Published permit rows + fee relief documented | ADU electrical cost |
| Delivery and setting | Freight leg published; setting quoted | ADU installation cost |
| Foundation | Drivers now; no public fee table exists | Below, and on the California cost table |
| The unit | Factory price, confirmed per order | The quote process |
What ADU foundation cost covers
An ADU foundation cost line buys four things: the soil report, the engineering that matches a slab or pier system to that soil, the excavation and forming, and the anchor points the unit ties into. Ground conditions split the line before pricing starts. A flat lot with open access takes a slab; a slope takes stepped piers and more engineering hours.
Why no published table: every input is a fact of the lot rather than a market rate. Soil reports are quoted per geotechnical investigation, and no city or state prints a fee schedule for them. Excavation and forming move with access and disposal, and seismic or frost requirements change the design rather than just the price. Where published numbers do touch this line, they are the permit-side rows already tabulated on our California cost table, not the ground work itself. The practical shortcut is sequencing: a soil report is the first dollar spent, and its findings are what turn the foundation line from a range into a quote.
Where ADU electrical cost runs
The electrical line runs from the street to the last outlet: trenching, the connection to supply, a subpanel in the unit, and branch circuits. Whether the main panel needs an upgrade depends on the capacity it has left, which is a site fact, not a market rate. California separates the fee from the work: ADUs inside existing space pay no connection fee or capacity charge under Gov. Code 66311.5(b),(d), a new detached unit connects under §66311.5(e) with proportionate charges, and the physical tie-in remains a quoted line either way. The published permit rows, San Diego's circuit and panel schedule among them, are tabulated on our ADU electrical cost page.
How ADU installation cost breaks down
Installation is three moves: getting the unit to the address, setting it, and tying it down. Delivery pricing follows distance and unit type, because a flat-packed expandable unit ships on standard equipment where a volumetric box may need escorts. Setting is crane work on tight sites or a ground-set with a reach stacker where access allows. Crew days on site finish the anchor points and the roofline joints. The ocean freight leg is the one piece that publishes, and the container indices behind it are tabulated with per-unit arithmetic on our ADU installation cost page. The three moves are quoted together but priced separately, and access photographs are the cheapest way to tighten the number.
Where the numbers live
The permit fees page carries the published city rows, and the California cost table walks a full 750 sq ft example to a $17,278.93 city subtotal. Physical lines stay quote-based in this library on purpose: a fake national average is worse than no number, and a real quote prices your ground, your panel and your access together.
FAQ
The engineering and the ground work: a soil report, the slab or pier design that the soil supports, excavation and forming, and the anchor points the unit bolts to. A flat site with open access and a slope that needs stepped piers are different projects before any pricing starts, which is why no honest national number exists for this line.
Only when the existing panel has no capacity to spare. The tie-in itself is trenching distance, a new subpanel in the unit, and the utility's connection process. In California the fee side depends on the unit: ADUs created within existing space pay no connection fee or capacity charge (Gov. Code §66311.5(b),(d)), while a new detached ADU can be required to connect, with any charge proportionate to its burden (§66311.5(e)). The physical work is quoted per site either way.
No. Delivery moves the unit from factory to your address; installation covers the crane or ground-set operation, the crew days on site, and bolting the unit to its foundation. Distance, site access and unit type (flat-packed versus volumetric) drive all three, so the lines are quoted together but priced separately.
The permit fees page quotes city fee schedules line by line, the electrical page carries San Diego's published circuit and panel rows, and the installation page tabulates the container freight indices. The California cost table walks a full worked example. Physical lines like foundation stay quote-based here on purpose: publishing a fake average would be worse than publishing nothing.
Logistics planned with the quote
Destination port, quantity and layout in. Factory price with a freight and loading plan out in one business day.
- Gov. Code §66311.5 (connection fee relief for ADUs); leginfo.legislature.ca.gov (accessed 2026-09-21)
- City of San Diego Information Bulletin 501; sandiego.gov (accessed 2026-09-21)
- California DGS/OPSC developer fee history; dgs.ca.gov (accessed 2026-09-21)
Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.