Washington requires every city and county that fully plans under the Growth Management Act to allow at least two accessory dwelling units per lot in any urban-growth-area zone where single-family homes are allowed (HB 1337, in force July 2023). The state also sets floors the locals cannot undercut. ADUs must be allowed at least 1,000 sq ft and 24 ft of roof height, owner-occupancy can't be required, and parking is capped by tier, while leaving room above those floors for local design standards.
What you can build
- At least two ADUs are allowed on every lot in all zoning districts within an urban growth area that allow single-family homes: as one attached plus one detached, two attached, or two detached units, in one or two buildings. Smaller lots (2,000 sq ft or less) may be limited to two ADUs plus the main home.
- No owner-occupancy requirement: a city or county cannot require the owner to live in the ADU or any other unit on the lot. Cities may still regulate short-term rentals.
- Parking is capped in tiers: no parking may be required within a half-mile walking distance of a major transit stop; lots under 6,000 sq ft may be charged no more than one space per ADU; larger lots no more than two. Exceptions apply within a mile of a commercial airport with 9M+ annual boardings and where a Commerce-certified traffic study justifies more.
- State minimums bind the locals: ADUs must be allowed at least 1,000 sq ft of building area and roof heights of at least 24 ft (or the main home's height, if lower), and ADU standards cannot be stricter than those for the primary home. Above those floors, cities and counties set their own size and design standards.
- Site-level exceptions exist (critical areas and their buffers, certain protected drinking-water watersheds, lots without public sewer, and some low-density sensitive areas) but there is no small-jurisdiction exemption: every GMA-planning city and county is covered.
Approval pathway
Local permit process
Applications proceed through each city or county's building-permit process under locally adopted ADU standards implementing HB 1337. Where a local ordinance has not yet caught up, the state standards directly override conflicting local rules.
Timeline
| Step | Statutory clock | Detail |
|---|---|---|
| Local ordinance deadlines | Tiered by county update cycle | Counties and their cities align on four periodic-update tiers under RCW 36.70A.130(5), and HB 1337 ADU ordinances take effect with each jurisdiction's own update. SB 5558 (2025) replaced the original six-month grace with same-time adoption. Update deadlines: 31 December 2024 for King, Kitsap, Pierce and Snohomish counties and their cities, whose ADU ordinances were due within six months of that date (by 30 June 2025) under the rule then in force; 31 December 2025 for Clallam, Clark, Island, Jefferson, Lewis, Mason, San Juan, Skagit, Thurston and Whatcom counties and their cities; 31 December 2026 for Benton, Chelan, Cowlitz, Douglas, Franklin, Kittitas, Skamania, Spokane, Walla Walla and Yakima counties and their cities; and 30 June 2027 for the remaining fifteen GMA counties and their cities. The Department of Commerce's periodic-update status report (September 2026) shows several jurisdictions in the 31 December 2025 tier past their update deadline with Growth Management Hearings Board cases pending; the report tracks plan-update status rather than ADU compliance specifically. |
| Review clock | Jurisdiction-specific | Washington sets no ADU determination deadline. Review periods follow each jurisdiction's published procedures. Populated per city as data is verified. |
Statutory clocks per state law; city practice varies and is noted per city below.
Key laws behind these rules
- HB 1337. Chapter 334, Laws of 2023 (signed 8 May 2023 with a partial veto; effective 23 July 2023): Two-ADU mandate in urban growth areas, owner-occupancy ban, tiered parking caps, and state minimum standards. Codified at RCW 36.70A.680 and .681 text ↗
- RCW 36.70A.680 / .681: Codified ADU standards: local development regulations, parking tiers and state minimums text ↗
- Washington Department of Commerce. ADU guidance: State implementation guidance for local jurisdictions text ↗
City examples
Washington's mandate and minimums are state-set, but design details and fees above the state floors vary by city and county. City tables (Seattle, Spokane, Tacoma and others) are populated from published municipal codes as they are verified, each with its own as-of date. Not yet loaded for this profile.
FAQ
In urban growth areas, yes. Every GMA-planning city and county must allow at least two ADUs per single-family lot. There is no small-city exemption; only site-level exceptions (critical areas, protected watersheds, unserved lots) narrow where they go.
No. HB 1337 bars owner-occupancy requirements for the main home or the ADUs, along with mandatory new parking beyond the tiered caps (none near major transit stops; one to two spaces elsewhere).
State law sets the floor: cities must allow ADUs of at least 1,000 sq ft with at least 24 ft of roof height, and ADU standards cannot be stricter than those for the primary home. Cities may allow more. Seattle's rules, for example, go further.
Export-grade expandable container ADUs
10ft to 40ft expandable units engineered for ADU programs: flat-packed, 15-20 day standard lead time, priced confirmed per order.
- Washington State Legislature; HB 1337, Chapter 334, Laws of 2023 (partial veto); Session Law PDF and bill page, app.leg.wa.gov (accessed 2026-09-21)
- RCW 36.70A.680 and .681; codified ADU standards (accessed 2026-09-21 and 2026-10-22)
- Washington State Department of Commerce; ADU planning guidance (accessed 2026-09-21)
- RCW 36.70A.130(5); periodic update tiers: 31 December 2024 (King, Kitsap, Pierce, Snohomish), 31 December 2025 (Clallam, Clark, Island, Jefferson, Lewis, Mason, San Juan, Skagit, Thurston, Whatcom), 31 December 2026 (Benton, Chelan, Cowlitz, Douglas, Franklin, Kittitas, Skamania, Spokane, Walla Walla, Yakima), 30 June 2027 (remaining fifteen counties); each tier includes the cities within those counties; app.leg.wa.gov (accessed 2026-10-22)
- RCW 36.70A.680(1)(a); ADU ordinances "to take effect at the same time as the jurisdiction's next periodic comprehensive plan update required under RCW 36.70A.130" (credit 2025 c 148 s 4; 2023 c 334 s 3); app.leg.wa.gov (accessed 2026-10-22)
- Washington State Department of Commerce; GMA periodic update and GMHB status report, updated September 2026; commerce.wa.gov/growth-management/gma-topics/periodic-update/ (accessed 2026-10-22)
- SB 5558 (2025, Chapter 148, Laws of 2025); moved the 2025 and 2026 update tiers from 30 June to 31 December and made HB 1337 ADU regulation updates due at the same time as each jurisdiction's periodic update instead of six months after (the King/Kitsap/Pierce/Snohomish tier stayed at 31 December 2024; the 2027 tier is unchanged at 30 June 2027); Commerce planners' bulletin, 29 May 2025, leg.wa.gov Summary of Legislation 2025, and SSB 5558 session law, Section 4 (accessed 2026-10-01 and 2026-10-22)
Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.