Texas ADU Rules: City-by-City, No Statewide Statute

State profile Regulations as of Sep 2026 Verified Last verified 2026-09-21
Quick answer

Texas has no statewide ADU statute: whether you can build one, and to what standards, is decided city by city (and by counties outside city limits). Austin allows additional dwelling units on single-family zoned lots of 5,750 sq ft or more; Houston, Dallas and San Antonio each regulate ADUs under their own codes. There is no statewide ministerial approval clock.

What you can build

  • Land-use control is municipal: each city adopts its own ADU standards, and unincorporated areas follow county rules. There is no state ADU statute to override local rules (unlike California).
  • Austin: additional dwelling units are allowed on property zoned SF-1, SF-2 or SF-3 with a minimum lot area of 5,750 sq ft, and each unit receives its own address number.
  • Houston: no zoning ordinance. ADUs proceed under the building codes (Chapters 10, 19 and 23), platting requirements and private deed restrictions, per the city's official "How to ADU" guidance.
  • Dallas: ADUs are regulated under Development Code Sec. 51A-4.510 through two paths. An ADU Overlay (2018 ordinance) or a Board of Adjustment special exception; most single-family zones do not allow them by right.
  • San Antonio: secondary dwelling units are provided for by Unified Development Code Sec. 35-371, with a city Permit-Ready plan library for casitas.

Approval pathway

2

County process (unincorporated land)

Outside city limits, county development rules apply and vary by county. Populated at production.

Timeline

StepStatutory clockDetail
Review clockCity-specificNo statewide determination clock exists. Austin's page publishes no fixed review period; permits expire on the 181st day without a passing inspection, and each scheduled or passed inspection extends them by 180 days. Canceled or failed inspections do not extend the window.
OccupancyAfter final inspectionCertificate of Occupancy issues only after a passing final inspection.

Statutory clocks per state law; city practice varies and is noted per city below.

Key laws behind these rules

  • City of Austin. Additional Dwelling Units: Official ADU page: SF-1/2/3 zoning, 5,750 sq ft minimum lot, permitting steps and STR restriction text ↗
  • Austin Land Development Code (HOME amendments): Code basis for additional dwelling units and multi-unit options on single-family lots. City documents at production
  • Dallas Development Code, Sec. 51A-4.510: ADU Overlay and Board of Adjustment exception paths (not by right in most single-family zones) text ↗
  • San Antonio UDC, Sec. 35-371: Secondary dwelling unit provisions; city casita page with Permit-Ready plans text ↗
  • Houston. How to ADU (page offline since Sep 2026): Official guidance: deed restrictions check, platting, building permits (no zoning step). The houstontx.gov planning page was removed in a site restructure; Houston ADU rules live in the development code and the permitting center

City examples

Texas has no state-wide fee schedule: plan review and permit fees are set per city and vary by property and scope. Fee tables (Houston, Austin, Dallas, San Antonio) are populated from each city's published fee schedule as they are verified. Each row carries its own as-of date. Not yet loaded for this profile.

FAQ

There is no statewide yes or no. ADUs are legal where your city allows them, under the city's own standards. The four largest cities (Houston, Austin, Dallas, San Antonio) all provide ADU pathways, but lot sizes, size caps and processes differ. Rural or unincorporated land follows county rules.

The lot must be zoned SF-1, SF-2 or SF-3 with at least 5,750 sq ft of area. Each unit gets its own address, goes through the city's building permit process, and needs a Certificate of Occupancy after final inspection.

Depends on the city. In Austin, ADUs built after October 1, 2015 cannot be used as short-term rentals for more than 30 days per calendar year, and the short-term-rental license application needs the unit's Certificate of Occupancy.

Factory direct

Export-grade expandable container ADUs

10ft to 40ft expandable units engineered for ADU programs: flat-packed, 15-20 day standard lead time, priced confirmed per order.

Get a factory quote
Sources & verification
  • City of Austin; Additional Dwelling Units page; austintexas.gov (accessed 2026-09-21)
  • Austin Land Development Code / HOME amendments; referenced by the city ADU page (accessed 2026-09-21)
  • City of Dallas; Accessory Dwelling Units page (Ord. 30931/30930 paths, Sec. 51A-4.510); dallascityhall.com (accessed 2026-09-21)
  • City of San Antonio; Casita/ADU page and UDC Sec. 35-371; sa.gov (accessed 2026-09-21)
  • City of Houston; How to ADU; houstontx.gov/planning (page removed from the city site; verified 2026-09-21, offline 2026-09-22)
  • Texas Legislature; SB 673 (89R, proposed statewide ADU regulation) died in committee, confirming no statewide statute (accessed 2026-09-21)
Verified 2026-09-21 by SunModu Atlas
Corrections

Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.