Arizona's HB 2720 (signed 21 May 2024) requires cities with more than 75,000 residents to adopt regulations permitting at least one attached and one detached accessory dwelling unit per lot zoned for single-family dwellings, with ordinances in place by 1 January 2025. Cities cannot condition ADU permits on restrictive covenants between private parties, and the state sets a minimum buildable size (75% of the home's floor area or 1,000 sq ft, whichever is less) rather than a cap.
What you can build
- Covered cities (Phoenix, Tucson, Mesa, Scottsdale, Chandler, Glendale, Gilbert, Tempe and every other municipality of more than 75,000 residents) must allow at least one attached and one detached ADU per single-family lot. Parcels of an acre or more that include an affordable ADU must allow a third, detached unit.
- Cities may not condition ADU permits on the owner adopting restrictive covenants between private parties (though private parties can still sign them voluntarily).
- Short-term rentals stay legal: state law bars cities from prohibiting vacation or short-term rentals (A.R.S. §9-500.39(A)). For ADUs built after the 2024 act, a city may instead require the owner to live on site when the ADU is used as a short-term rental.
- The state sets a floor, not a cap: covered cities must allow an ADU of at least 75% of the single-family home's gross floor area or 1,000 sq ft, whichever is less. Larger sizes are up to each city. Tucson's code, for example, allows ADUs up to 10% of lot size capped at 1,000 sq ft, and every lot is guaranteed at least 650 sq ft.
Approval pathway
City permit process
Applications proceed under each covered city's adopted ADU ordinance and building-permit channels. The state requires the ordinances to exist, not a uniform process: check the city code for setbacks, size caps and design review.
Timeline
| Step | Statutory clock | Detail |
|---|---|---|
| Review clock | City-specific | Arizona sets no determination deadline for ADU permits. Review periods follow each city's published procedures. Populated per city as data is verified. |
Statutory clocks per state law; city practice varies and is noted per city below.
Key laws behind these rules
- HB 2720. Laws 2024, Chapter 196 (signed 21 May 2024): ADU mandate for Arizona cities of more than 75,000 residents: at least one attached and one detached ADU per single-family lot, ordinances adopted by 1 January 2025 (new A.R.S. §9-461.18); amends the state short-term rental statute (§9-500.39) text ↗
- Arizona Legislature. HB2720 bill page (offline since Sep 2026; enrolled text above): Bill status, summaries and floor documents. The legislature's bill-detail URL now 404s; the enacted Chapter 196 PDF above carries the final text
City examples
Arizona's mandate is state-set but standards are local: size caps, setbacks and fees vary by city (e.g. Tucson's 1,000 sq ft ceiling). City tables (Phoenix, Tucson, Mesa, Scottsdale and others) are populated from published municipal codes as they are verified, each with its own as-of date. Not yet loaded for this profile.
FAQ
In every city of 75,000 or more residents, yes. HB 2720 requires those cities to allow at least one attached and one detached ADU per single-family lot. Smaller towns and unincorporated county land follow local rules.
Arizona sets a minimum buildable size, not a cap: covered cities must allow an ADU of at least 75% of the home's gross floor area or 1,000 sq ft, whichever is less. Each city can allow more. Tucson's code, for instance, permits ADUs up to 10% of lot size capped at 1,000 sq ft (with every lot guaranteed at least 650 sq ft).
Short-term rentals stay legal. State law bars cities from prohibiting them. For ADUs built after the 2024 law took effect, a city can require the owner to live on site when the ADU is used as a short-term rental (Phoenix requires exactly that under its ADU and STR registry rules).
Export-grade expandable container ADUs
10ft to 40ft expandable units engineered for ADU programs: flat-packed, 15-20 day standard lead time, priced confirmed per order.
- Arizona Legislature; HB 2720, Laws 2024 Chapter 196 (final enacted text, signed 21 May 2024); azleg.gov (accessed 2026-09-21)
- City of Phoenix; ADU page, ADU beginner's guide and STR registry; phoenix.gov (accessed 2026-09-21)
- City of Tucson; ADU Code Amendment page (2021 amendment; HB 2720 compliance amendment effective 21 November 2024); tucsonaz.gov (accessed 2026-09-21)
- City of Tempe; Accessory Dwelling Units; tempe.gov (accessed 2026-09-21)
- Morrison Institute, Arizona State University; Accessory Dwelling Units and HB 2720 in Arizona (accessed 2026-09-21)
Something look off: a fee, a date, a rule? Email tianxin@sunmodu.com. Every message gets reviewed and accepted fixes are dated right here on the page, and with your okay, we'll thank you by name for pointing it out.