Quick answer

Can you build an ADU on your property? In the ten states this site profiles, the first answer is usually yes at the state level: California requires ministerial approval statewide, Washington and Oregon mandate allowance, and Colorado, Arizona, Utah and North Carolina now set their own floors. The rules wrapped around that yes sit at different levels. Addresses are a city function everywhere. Front yards are local zoning, except California protects an 800 square foot unit even inside a front setback and North Carolina lets cities push ADUs to the side or rear. Duplex lots, manufactured homes and distances are California-scripted and elsewhere local, while separate sales are scripted in California and Washington. The table below carries each state's line.

Can you build an ADU on your property? For most of the ten states this site profiles, the state answer is yes on at least some residential lots, and the real rules live one layer out: whether the unit can carry its own address, whether it can face the street, what happens on a duplex lot, whether a manufactured home counts, whether it can ever be sold, and how close it may sit to your house. Those questions have patchwork answers by design, because American property regulation splits the same little building across three levels of government. This page works through the seven families one at a time, and every answer names the level that decides it.

Where you can build an ADU on your property

State The state-law floor
California Statewide allowance, ministerial approval, no hearings (Gov. Code §66317)
Washington Fully planning cities and counties must allow at least two ADUs per lot (HB 1337)
Oregon Cities over 2,500 and counties over 15,000 inside urban growth boundaries must allow one (ORS 197.312)
Colorado Covered jurisdictions must allow one ADU administratively; HOA bans void (HB24-1152)
Arizona Cities over 75,000 must allow one attached and one detached ADU (HB 2720)
Utah Internal ADUs by right statewide; detached ADUs a required use in specified cities from October 2026 (SB 284)
North Carolina Cities of 50,000+ outside coastal areas must allow ADUs, applications from January 15, 2027 (S.L. 2026-59)
Florida Local-option ordinance law; no statewide allowance or ban (Fla. Stat. §163.31771)
Texas No state statute; city codes decide (Austin, Houston, Dallas, San Antonio each regulate)
Georgia No state statute; Atlanta allows detached ADUs by right in three districts

That first yes is the easy layer, and seven of ten states now supply it in statute. Even where the state speaks, the floor usually covers whether you may build, not the details of what you may build or where on the lot it goes. The rest of this page is about those surrounding rules, because almost none of them live in the same place as the allowance itself, and the differences decide everything from your mailbox to your resale options.

Does an ADU get its own address?

No state has an ADU addressing rule, and none is expected: assigning addresses is a city and county function everywhere, tied to emergency response and postal infrastructure rather than to housing law. City practice is the layer that matters, and it is not uniform. Austin requires a unique address or building number for each new dwelling unit before the residential building permit goes in, and points applicants to its address management desk to obtain one. Tacoma requires a separate address visible from the street, requested from the permit department once construction wraps. In the other profiled states the answer is the same in structure: your local addressing desk assigns the number, the timing just differs between before-permit and after-built. One practical distinction saves confusion at city counters: the assigned address and the mail delivery registration are two separate steps, and the second one involves the postal service rather than the city.

Can an ADU go in the front yard?

Local zoning owns front setbacks almost everywhere, but two states have written scripts. California lets cities keep front setback standards while forbidding them from using those standards to preclude an ADU of at least 800 square feet, even if it would sit partially or wholly inside the front setback (Gov. Code §66321(b)(3)). The state's handbook answers the question in exactly those words and adds that a detached ADU under §66323(a)(2) may sit in the front setback, which is the provision most backyard units ride on. The logic is anti-evasion: a city cannot do indirectly, through the front yard, what state law forbids it to do directly. North Carolina moves the other way: its 2026 law lets covered cities require the ADU to be located to the side or rear of the primary dwelling, and Raleigh's code puts it at or behind the front wall of the house. The two scripts can produce opposite outcomes on identical lots across state lines, so this is the question to take to your local zoning counter with your lot plan in hand.

What about a duplex lot or a manufactured home?

California scripts both, and its multifamily numbers are wider than commonly repeated. Under §66323(a)(3), a lot with an existing multifamily building must be allowed at least one ADU inside the building and up to 25 percent of the existing units. On multifamily lots, detached ADUs run up to eight where buildings exist and two where they are proposed, and no unit-count threshold gates the right, which surprises owners who assume the rules only reach five-unit buildings. The state's handbook treats a duplex as multifamily for these rules, so a two-unit building carries the same conversion rights. On construction type, §66313(a)(2) includes a manufactured home in the ADU definition itself, though lots inside mobilehome parks stay outside it. North Carolina's new statute anchors its allowance to single-family detached dwellings, but Raleigh's local code allows ADUs on lots with two-unit living and accepts manufactured homes subject to design conditions such as a minimum roof pitch. In the other eight states, both questions default to local codes, and the honest answer is to read your city's ADU ordinance before assuming either way.

Can you sell an ADU separately from the house?

Separate sale is the rarest rule in the stack, because it collides with the way American lots are titled and financed. Two profiled states write the script. California relies on a local ordinance: where a city adopts one, an ADU can be conveyed as a separate condominium, subject to the ownership structure, subdivision mapping, safety certifications, written consent from every lienholder and recording requirements of Gov. Code §66342. The lender-consent requirement is the practical gate: every bank holding a loan on the property must agree in writing. Washington writes a floor directly: cities and counties there may not prohibit the sale of a condominium unit independently of the principal unit solely because it was originally built as an ADU (RCW 36.70A.681(1)(k)), so a condominium conversion is the route. North Carolina runs the protection the other direction: the new law bars subdividing the parcel so the ADU would sit on a different one, and Raleigh states outright that ownership of an ADU shall not be transferred apart from its principal dwelling. Atlanta's current rules prohibit separate sale as well. In the remaining eight states there is no state path in either direction, so the default holds: the ADU stays on the same title as the main house, and any arrangement that slices ownership differently needs a lawyer rather than a permit.

Distance and size: which level sets what

State law is mostly silent on the gap between buildings. California's handbook says so directly: state ADU law does not address the distance between an ADU and other structures on the lot, which leaves spacing to building and fire codes rather than the ADU statute. Austin is the only profiled city with a published line the other way, noting zoning no longer requires a minimum distance between units. Size is where states do write, and California's numbers are worth reading twice because two of them look similar and do different jobs. The floors a city cannot cut below are 850 square feet for any ADU and 1,000 for one with more than one bedroom; the separate 800 square foot benchmark is the unit a city must allow regardless of its own standards, with four-foot side and rear setbacks, and height tiers that reach 25 feet for attached units. Washington floors at 1,000 square feet and 24 feet of roof height; Arizona sets a minimum buildable size rather than a cap; Colorado protects units of 500 to 750 square feet from bans; North Carolina caps covered cities at 800 to 1,000 square feet, allows a setback requirement up to ten feet, and requires the ADU to be smaller than the primary dwelling. Atlanta caps at 750. Everywhere else, size and spacing ride on local codes and the building code.

Which counter do you ask, and in what order

The seven families land on different desks, and asking the right one first saves weeks. The state question, whether your lot qualifies for the allowance at all, is answered by the state profiles and the statutes they cite, so read that before calling anyone. The local questions, front yard placement, duplex lots, manufactured homes and spacing, belong to your city's zoning counter, which reads the local ordinance for a living; bring your lot plan and your parcel number. The address question belongs to the city or county addressing desk, which is sometimes the building department and sometimes a separate GIS or public-works unit, and it is worth resolving before your permit application rather than after. The sale question, if you are in California and your city has adopted the ordinance, runs through the county recorder's office for the condominium documents, with your lender in the loop from the start. Where your state has no rule, the honest first question to the counter is which of these decisions the city has actually made, because silence at the state level means the local code is the whole answer.

The rest of the property-rule stack, HOA bans, how many ADUs a lot can carry, empty lots and build order, lives in our rules FAQ, and each state's complete floor is in its state profile.

FAQ

In seven of the ten profiled states, state law now guarantees an allowance on at least some residential lots: California statewide with ministerial approval, Washington and Oregon by mandate, Colorado and Arizona for covered jurisdictions, Utah for internal ADUs statewide, and North Carolina for larger cities from January 2027. Texas and Georgia have no state statute, and Florida's law is a local option, so the answer there comes from your city. The profiles linked from the table below carry each state's exact floor.

No state addresses this, because addressing is a city and county function. Practice varies: Austin requires a unique address for each new dwelling unit before the building permit goes in, and Tacoma requires a separate address visible from the street, requested after construction. Ask your local addressing desk early either way; mail delivery is a separate registration from the assigned address.

Mostly a local question, with two state scripts. California lets cities keep front setbacks but not use them to preclude an 800 square foot ADU, even one sitting partially or wholly inside the front setback, and the state's handbook confirms a detached ADU may sit in the front setback. North Carolina goes the other way: covered cities may require the ADU to sit beside or behind the main house, and Raleigh puts it at or behind the front wall. Elsewhere, your local zoning decides.

Almost never, and only where a state writes the path. Two of the profiled states have one: California lets a city adopt an ordinance that allows an ADU to be conveyed as a separate condominium under Gov. Code §66342, with lender consent and subdivision rules attached, and Washington bars its cities and counties from prohibiting the separate sale of a condominium unit solely because it was built as an ADU (RCW 36.70A.681(1)(k)). North Carolina's new law bars subdividing the lot so the ADU sits apart, and Raleigh bars transferring ownership separately. In the other eight states, the ADU stays on the same title as the main house.

Factory direct

From rule check to factory quote

Layout, quantity and destination port in, factory price with a freight and loading plan out in one business day.

Get a factory quote
Sources & verification
  • Gov. Code §66317 (ministerial approval) and §66321(b)(2)-(b)(4) (size floors 850/1,000 sq ft; 800 sq ft and 4-foot side and rear setback protection; height tiers); leginfo.legislature.ca.gov (accessed 2026-09-24)
  • Gov. Code §66323(a)(3)-(a)(4) (multifamily: at least one ADU and up to 25 percent within existing buildings; up to 8 detached on existing multifamily lots, 2 on proposed) and §66313(a)(2) (manufactured home included in ADU definition); leginfo.legislature.ca.gov (accessed 2026-09-24)
  • Gov. Code §66342 (ADU condominium conveyance requirements; created by AB 1033 as former §65852.26, codified at §66342 by SB 477); leginfo.legislature.ca.gov (accessed 2026-09-24)
  • RCW 36.70A.681(1)(k) (cities may not prohibit separate sale of an ADU condominium unit; HB 1337, 2023 c 334); app.leg.wa.gov (accessed 2026-09-24)
  • California HCD, ADU Handbook (January 2025 edition via the Assembly Housing Committee): front setback FAQs at p.38; detached-in-front-setback table row at p.20; manufactured-home FAQ at p.31; multifamily and mobilehome-park FAQs at p.32; distance-between-structures FAQ at p.38 (accessed 2026-09-24; statute text verified against current leginfo)
  • NC S.L. 2026-59, G.S. §160D-917(c)(1)-(2), (f), (g) (setback, side-or-rear location, no subdivision, smaller than primary); ncleg.gov via rendered-text channel (accessed 2026-09-24)
  • Raleigh UDO Sec. 2.6.3 (ADU location behind front wall; duplex lots; manufactured home conditions; ownership not transferred separately); udo.raleighnc.gov (accessed 2026-09-24)
  • Austin ADU page (unique address per dwelling unit; no minimum distance between units by zoning) and Tacoma ADU tip sheet (separate address visible from the street); austintexas.gov, tacomapermits.org (accessed 2026-09-24)
  • State floors for Washington, Oregon, Colorado, Arizona, Utah, Texas, Florida and Georgia; this site's state profiles, each verified Sep 2026
Verified 2026-09-24 by SunModu Atlas